Playground Project

Our Goal

"Our goal for the musical community playground is to provide a safe, inclusive space where children and caregivers can gather and enjoy the outdoors. The new playground is being planned with an eye toward greater inclusion and will be wheelchair accessible,” says Rhonda Sprague, co-chair of the LOLPA Playground Subcommittee.

Playground Features & Plan

The town of Land O’ Lakes will soon benefit from a new community playground on the grounds of the Town Hall building. The theme for the project is “Play, then Stay.”
 

The playground will be constructed in two phases. Phase One, to be completed in summer 2022, features a new and fully accessible musical playground and swinging equipment. Phase Two, slated for installation in 2023, will feature structures and equipment designed specifically for 2-5 and 6-12 year-olds.      

The project is being spearheaded by Land O’ Lakes Public Art (LOLPA), with the support of the Town of Land O’ Lakes and community volunteers.

Between August 2021 and December 2021, LOLPA representatives conducted focus groups and distributed surveys to area business leaders, school employees, students, church members, and residents to gather input about new equipment and other needs for the play space. The Town Board received regular updates about the planning and ordered a survey of the space to determine the best location for the playground. 

Bids were collected from three vendors. After careful consideration, LOLPA elected to contract with Lee Recreation, LLC. Lee Recreation, based in Cambridge, Wis., is the exclusive distributor of BCI Burke Playground, Park and Recreation Equipment. BCI Burke, headquartered in Fond du Lac, Wis., offers equipment catering to all ages and abilities, including freestanding pieces, components, and complete structures. Lee also is a distributor for Percussion Play Outdoor Musical Instruments.

The cost of Phase One is estimated at $54,000. Phase Two is still in the planning stages. All funding will come from private and public donations, grants, and corporate sponsorships. The town will help with removal of the old equipment, site preparation, installation of additional lighting and fencing, and maintenance. 

Land O’ Lakes Community Playground, Inc. is a 501(c) (3) federal tax-exempt charity. Donations are tax deductible to the extent allowed by law. 

Our Timeline

Our tentative timeline is as follows:

Summer/Fall 2021: Secure bids from vendors.

Winter 2022: Select final vendor and plan initial installation.

Spring/Summer 2022: Install first phase (toddler area).

Summer/Fall 2022: Continue fundraising and planning remaining elements.

Spring/Summer 2023: Install remaining playground elements.